Steel Related Industry 43 Project Reprts

  • Model: CD51
  • Units in Stock: 900

$17,000.00

We provide prefeasibility industrial project reports in CD or as eBook to our valuable clients. Our bundle offer is for these 43  Industrial Project Reports.

  1. 1.         Aluminium Ingots Project Report

    2.         Aluminium Utensils Project Report

    3.         Aluminium Wire Drawing Project Report

    4.         Aluminium, Brass, Copper Scraps Project Report

    5.         Bi-Metal Bushes Project Report

    6.         Blast Furnace Project Report

    7.         Bolts & Nuts Project Report

    8.         Brass and Copper Tube Project Report

    9.         Bright Bar Project Report

    10.       C.I. Casting (Foundry) Project Report

    11.       Ceramic Coated Steel Pipe Project Report

    12.       Cold Rolled Pressed Steel Doors Project Report

    13.       Copper Wire Drawing Annealing Project Report

    14.       E.R.W. Steel Pipes & Tubes Project Report

    15.       Fabrication of Sheet Metal Components Project Report

    16.       Galvanized Iron (G.I.) Wire Project Report

    17.       Geuge Reduction of Iron and Steel Project Report

    18.       Investment Casting Project Report

    19.       Metal Cutting - Off & Grinding Wheels Project Report

    20.       Metal Wires Project Report

    21.       Metallurgical Coke Project Report

    22.       O.T.S. Tin Cans Project Report

    23.       Oil Seal Rings metal Cups Project Report

    24.       Printed Tin Containers Project Report

    25.       Re - Rolling Of Steel Sections Project Report

    26.       S.G. Iron & Alloy Steel Casting Project Report

    27.       Sintered Metal Products Project Report

    28.       Sponge Iron Project Report

    29.       Stainless Steel Cutlery Project Report

    30.       Stainless Steel Pipes Project Report

    31.       Stainless Steel Utensils Project Report

    32.       Steel Casting Project Report

    33.       Steel Chain Project Report

    34.       Steel Drum and Barrels Project Report

    35.       Steel Foundary Project Report

    36.       Steel Furniture Project Report

    37.       Steel Ingots Project Report

    38.       Steel Rolling Mill (By Induction Furnace) Project Report

    39.       Steel Wire Drawing & Galvanizing Project Report

    40.       Steel Wire Rope Project Report

    41.       Steel Wool Project Report

    42.       Tar Felt (Bitumen Felt) Project Report

    43.       Zinc Metal from Zinc Ash Project Report

Individual cost of each project report is USD 400 per project report.  Hence total cost is USD 2000 Discounted cost for limmited time USD 1000.

The contents of project report are as follow:

 1.Introduction                                                                       

3.Market survey                                  

4.Present manufacturers/exporters                                           

9.Process/Procedure (Whatever applicable)                     

10.Process flow chart                             

11.Raw material suppliers                         

12.Plant & machinery suppliers                   

13.Cost of plant economics                                                                                                                 

14.Land & building                                                                                                                                                

15.Plant and machinery                                                                                                                      

16.Fixed capital investment                                                                                                              

17.Raw material                                                                                                                                     

18.Salary and wages                                                                                                                            

19.Utilities and overheads                                                                                                                

20.Total working capital                                                                                                                      

21.Cost of production                                                                                                                         

22.Profitability analysis                                                                                                                       

23.Break even point                                                                                                                                            

24.Resources of finance                                                                                                                     

 
You can receive a copy of project reports  from this website any time, from anywhere in world instantly OR ask us to send your CD version of the same to your shipment/mailing address.

You can download our other formulation eDocument files, technical know-How eRoprts and formulation eBooks from our following websites:

www.projectreportsonline.in

www.how2make.in

www.howtomakeproduct.com




This product was added to our catalog on Thursday 17 March, 2016.

wastrong template